• Project Name: CONSTRUCTION OF RAINWATER DRAINAGE SYSTEM FROM THE GOMA AIRPORT TO LAKE KIVU – DRC
  • Client: CEPTM/PASAG
  • Funder: World Bank
  • Year Completed: Ongoing
  • Contract No: 422/PASAG/CEPTM/C/BMB/PM/LT/2019
  • Project Duration: 9 Months
  • Company: Century Engineering Contractors

The works for the drainage include the demolition of existing reinforced concrete structures, the demolition of existing pavements, the partial demolition of the Bralima roundabout, the construction of the gutter over a length of 650 m, the construction of the carriageway over a length of 93.77 m, supply and installation of curbs and partial repair of the Bralima roundabout